Home 2020-06-02T10:44:12+00:00

HAEGANG

FORMWORK SYSTEMS

해강산업은 세계의 기술을 선도하며 높은 품질을 제공해드릴 수 있도록 최선을 다하고 있습니다.

HAEGANG Auto
Climbing System (HACS)

HAEGANG Auto-Profile
Climbing System (HAPS)

HAEGANG Auto-hydraulic
Mould System (HAMS)

Normal Climbing
System (NCS)

TS200
(Timber Beam System 200)

Coping
Formwork

FORM
WORK

HAEGANG
INDUSTRY

자동화 거푸집의 선두주자, 해강산업

ABOUT US

PROJECT

MORE
HAEGANG-IN EXTREMISProject : Temburong Bridge CC3, BruneiContractor : DaelimType : Cable-stayed bridge (Brunei Channel Bridge-1Pylon, Eastern Channel Bridge-2Pylon)Pylon Height : 110.5mFormwork System : HACS G10 / Catwalk System / HAPS / HG2400 / TS200 etc.The HAEGANG Auto-Climbing System (HACS), which is the most advanced automatic lifting formwork system of HAEGANG, has been successfully constructed to construct the symbolic core structure of the Temburong Bridge Project in the Kingdom of Brunei. It has helped the Korean special bridge construction technology to move to the world. HACS enables the construction of 110m highrise pylon to be constructed safely and economically, and the complexity of cross section is completely realized by applying HAPS (HAEGANG Auto-Profile climbing System) to the steep sloped Ribbed Section. We were able to obtain stability, economy, and shortening of construction time cycle. In addition, by applying the automatic lifting catwalk system of HAEGANG, we were able to secure an effective working group and mobilize safe workers’movements at the high altitude..www.linkedin.com/company/haegang-leading-formwork-industrywww.instagram.com/haegang_formwork_scaffoldingwww.haegangind.co.kr#JustHAEGANG #HAEGANG_IN_Extremis #해강산업 #HACS #TemburongBridge #Arup #Daelim #대림산업 #Pylon #ModularFormworkSystem
HAEGANG-IN EXTREMISProject : Temburong Bridge CC3, BruneiContractor : DaelimType : Cable-stayed bridge (Brunei Channel Bridge-1Pylon, Eastern Channel Bridge-2Pylon)Pylon Height : 110.5mFormwork
« 2 of 7 »